How to calculate quantity of cement ,sand & aggregate in 1m3 cube of concrete?

There are two main ways to design the concrete mix.

Design mix method :-
In this method, materials are proportioned based on the procedure and rules given in IS 456 (2000) and IS 10262) code

In this method, cement, sand and aggregates are always batched in terms of weight, and concrete can be designed for different environmental conditions and different needs. With the help of this method you can save cost .Quality of concrete from this method is better than nominal.

Nominal mix method :-

In this materials are proportioned based on prescribed approximation and experience to attain the different grade of concrete.

Cement, sand and aggregates are usually batched in terms of volume using batching box. It is easier to follow in construction site and useful to produce concrete up to M 20 grade.

Type of Concrete GradeMix RatioCharacteristic
Compressive strength of 
Concrete
28Days in N/mm2
Ordinary concrete M5 1:5:10 5 N/mm2


M7.5

1:4:8


7.5 N/mm2

M10

1:3:6

10 N/mm2

M15

1:2:4

15 N/mm2

M20

1:1.5:3

20 N/mm2
Standard Concrete M25
1:1:2
25 N/mm2

M30

Design Mix

30 N/mm2

M35

Design Mix

35 N/mm2

M40

Design Mix

40 N/mm2

M45

Design Mix

45 N/mm2

M50

Design Mix

50 N/mm2
High Strength 
Concrete
M55
Design Mix
55 N/mm2

M60

Design Mix

60 N/mm2

M65

Design Mix

65 N/mm2

M70

Design Mix

70 N/mm2

Concrete Mix Design for M20 Grade Concrete :-

Let , M 20 grade concrete

As per IS 456:2000 :- 1:1.5:3


Add all the volume to know the total volume = 1 + 1.5 + 3 = 5.5

Consider, Wet volume = 1 m3 

Dry volume =1.54 x 1 =1.54 m3  (it is increased by 54%)

Cement:-

Quantity of cement In Cubic metre = 1 x 1.54 / 5.5 = 0.28 m3 

Quantity of cement in kg = 1 x 1.54/5.5 x 1440 = 403.2 kg

Therefore , Density of cement = 1440 kg/ m3 

Number of cement bags required = 403.2/50 = 8.064 bags

Sand:

Quantity of sand in Cubic metre = 1.5 x 1.54/5.5 = 0.42 m3 

Quantity of sand in kg = 1.5×1.54/5.5×1500 = 630 kg

Therefore , Density of sand = 1500 kg/ m3 

Quantity of sand in Cubic feet = 1.5 x 1.54 /5.5 x 35.3147 = 14.83 cu.ft

Aggregates:

Quantity of aggregate in Cubic metre = 3 x 1.54 / 5.5 = 0.84 m3 

Quantity of aggregate in kg = 3 x 1.54 /5.5 x 1500 = 1260 kg

Therefore , Density of aggregate = 1450 – 1750 kg/ m3 

Quantity of aggregate in cubic feet = 3 x 1.54 /5.5 x 35.3147 = 29.66 cu.ft

Water:

For M20, 30 liters of water per 50kg cement .

Total amount of water required = 30 x 403.2 / 50 = 241.92 litre.


8.064 bags  of cement required for 1 cu.m of M20 grade concrete. 


630 kg of Sand required for 1 cu.m of M20 grade concrete. 


1260 kg of 20mm Aggregate is required for 1 cu.m of M20 grade concrete.


241.92 litre. of water is required for 1 cu.m of M20 grade concrete

One thought on “How to calculate quantity of cement ,sand & aggregate in 1m3 cube of concrete?

  • Hi, are you promoting your business with Social Media Marketing?? There’s a non-exploited market on Social Media that most people don’t take advantage of. If you’d like to learn how to promote on Instagram effectively, we’re giving a Limited time offer now due to COVID19 for our course, it used to be $297, you can get it now for only $7! Here’s the link to the course: https://www.digistore24.com/redir/319134/larrosamarcelo/