Quality Engineer must know these Technical Knowledge
Material Evaluation and Approvals
Supplier
Mix designs & Trail Mixes
Rebars & accessories
Embedment’s
Inspection
Survey & verification
Compaction testing (foundations)
Rebars & accessories
Embedments
Erection
Forms
Rebars
Embedments
Accessories
Inspection
Pre-Concrete inspection
Survey report
Compaction test report
Complete inspection check list
Concrete Pour Inspection
Trip ticket verification
Slump
Test Temperature check
Cylinder sampling & casting
Concrete Curing
Seven days wet curing
Compressive Testing
Three, seven and 28 days 4.000 psi min on 28 days
Completion of The Work
Inspection Check Sheets*
*For Inspection During Process
C-01 – TRIAL MIX OF CONCRETE
C-02 – COMPRESSIVE STRENGTH TEST OF CONCRETE
C-03 – RECORD OF ANCHOR BOLT FOR STEEL STRUCTURE
C-04 – CONTRIAL MIX OF CONCRETE
C-05 – TANK FOUNDATION RECORD
C-06 – EARTH & CONCRETE WORK FOUNDATION
C-07 – PROCTOR TEST
C-08 – CONCRETE AGGREGATES
C-09 – CABLE PULL PITS PRE POURING
C-10 – CABLE PULL PITS POST POURING
C-11- INSPECTION OF REINFORCING BAR INSTALLATION