In construction all work outside these limits is liable to rejection. The following table gives permissible deviations in the tolerances on construction.

Shuttering

Description Permissible Deviation
1Deviation from specified dimensions of cross section of columns and beams -6 mm
+12 mm
2Deviation from dimensions of footings
(a)Dimensions in plan -12 mm
+50 mm
(b)Eccentricity0.02 times the width of the footing in the direction of deviation but not more than 50 mm
(c)Thickness +0.05 times the specified thickness
3Departure from level shown on the drawing 6 mm
4Deviations
Abrupt irregularities/offsets caused by displaced or misplaced form work lining or supports
3 mm
5Inserts
Variations in the position along concrete surfaces
In plane position (flush with concrete face)
10mm
6 mm

Note:

These tolerances apply to concrete dimensions only, not to positioning of vertical reinforcing steel or dowels.

The formwork shall be capable of being dismantled and removed from the cast concrete without shock, disturbance or damage.

The arrangement shall be such that the soffit forms are properly supported on props, can be retained in position for such period as may be required by maturing conditions or specifications.


Measuring equipment accuracy in Batching plant.

  • Cement : + – 2%
  • Aggregate : + – 3%
  • Admixture : + – 3%
  • Water : + – 3%
  • Mixing time : 2 minutes for one mixing. (Mixing which is being done on site)

Tolerance for cutting Length

  •  When Specified length is not given = + 75 mm (or) – 25 mm
  • When minimum length is specified = + 50 mm (or) – 0 mm