How To Calculate Number Of Bricks, Cement And Sand For Brickwork ?

  1. Grade of mortar = 1:6 (cement : sand)
  2. Class A brick (19 cm x 9 cm x 9 cm)
  3. Volume of brickwork = 1.0 m3
  4. Thickness of mortar = 10 mm

Step 1 :- Calculation of bricks

No. of bricks = (volume of brick work / volume of one brick with mortar)

Volume of one brick (without mortar) = .19*.09*.09 = 0.001539 m3

since thickness of mortar = 10 mm (0.01 m)

 

 

Volume of brick with mortar = (0.19+0.01) x (0.09+0.1)x (0.09+0.1) = 0.2×0.1×0.1 = 0.002 m3

therefore,

No.of bricks = 1.0/ (0.002) = 500

consider the percentage of waste as 10 % or 15 %

Total no. of bricks = 500 + (10 x 500 )/100=550

 

 

Step 2 :- Calculation for quantity of mortar

Since we need 500 no of bricks

volume occupied by bricks = No of bricks x volume of one brick

Volume of bricks = 500 x 0.001539 = 0.7695 m3

Volume of mortar = Volume of BRICK WORK – Volume of BRICKS

therefore,

volume of Mortar = 1.0 – 0.7695 = 0.2305 m3

 

 

Step 3:- Calculation for Quantity of CEMENT

Cement = (dry volume of mortar x Cement ratio)/ sum of the ratio,s(proportion)

Dry volume of Mortar = 1.33 x 0.2305 = 0.3065 m3

( 33% increment due to volume shrink after water )

cement= (0.3065 x 1) / (1+6) = 0.3065/7= 0.043795 m3

cement (kg) = 0.043795 x 1440 = 63.0648 kg

No. of bags = 63.0648 / 50 = 1.26 bags approximately 2 bags

 

 

Step 4 :- Calculation for Quantity of SAND

Sand = (dry volume of mortar x Sand ratio)/ sum of the ratio,s(proportion)

or

sand = cement volume x 6 ( since 1:6 grade of mortar)

therefore,

sand = 0.043795 = 0.26277 m^3 or

sand = 0.26277 x 1920 = 504.5184 kg /1000 = 0.5045 tonnes or

sand = 0.26277 x 35.3147 = 9.279 cft or

sand = 0.26277 x 0.354 = 0.0930 brass

So, For

  1. Grade of mortar = 1:6 (cement : sand)
  2. Class A brick (19 cm x 9 cm x 9 cm)
  3. Volume of brickwork = 1.0 m3
  4. Thickness of mortar = 10 mm

Number of Bricks = 500

Cement = 1.26 bags of 50 Kg

Sand = 0.26277 m3