Slump IS 456
Lightly reinforced 25 – 75 mm
Heavily reinforced 75 – 100 mm
Trench fill (insitu & Tremie) 100 – 150 mm
(For Termie vibrator not required )
Accuracy of measuring equipment in batching plant.
Cement : + 2%
Aggregate : + 3%
Admixture : + 3%
Water : + 3%
Mixing time : 2 minutes for one mixing.(site Mixing)
TOLERANCE :-
Form work:-
In C/S for columns & Beams deviation is = + 12mm more (or) – 6mm less in size
In footing plan = + 50 mm more (or) – 12 mm less size
In depth = + 0.05 D (specified thickness).
Reinforcement:-
For effective depth D < 200mm = + 10mm
For effective depth D > 200mm = + 15mm
For Cover to reinforcement = + 10mm
TOLERANCE ON DIA IN LENGTH:-
0-25mm = + 0.5 %
25-35mm = + 0.6 %
35-50mm = + 0.8 %
TOLERANCE ON WEIGHT PER METRE:-
0-10mm = +7%
10-16mm = + 5%
16 and above = + 3%
TOLERANCE FOR CUTTING LENGTH :-
A) When the specified length is not given = + 75mm (or) – 25 mm
B) When the min. length is specified = + 50 mm (or) – 0 mm
DENSITY OF MATERIALS:-
Weight of Bricks = 1600-1920 Kg/M3
Weight of Block work = 1920 Kg/M3
Weight of R.C.C = 2310 – 2700 Kg/M3
CURING :-
Super Sulphate cement : 7 days
Ordinary Portland cement OPC : 10 days
Minerals & Admixture added cement: 14 days
STRIPPING TIME ( De-Shuttering) :-
For columns, walls, vertical form works : 16-24 hrs
Soffit formwork to slabs : 3 days (props to be refixed after removal)
Soffit to beams props : 7 days props to refix after removal.
Spanning up to 4.50m : 7 days
Spanning over 4.50m : 14 days
Arches spanning up to 6m : 14 days
Arches spanning over 6m : 21 days
CUBE SAMPLES :-
1 – 5 M3 : 1 No.
6 – 15 M3 : 2 No’s
16 – 30 M3: 3 No’s
31 – 50 M3: 4 No’s
Above 50 M3: 4 + 1 No of addition sample for each 50 M3
COMPRESSIVE STRENGTH:-
3 days : 45 %
7 days : 67 – 70 %
14 days : 85 %
28 days : 100% +
WATER CEMENT RATIO:-
M20 = 0.55
M25 = 0.50
M30 = 0.45
M35 = 0.45
M40 = 0.40
SPACING OF BARS :-
Provide the dia of the bar, if the dia of the bar are equal.
Provide the dia of the larger bar, if the dia are unequal.
5mm more than the nominal maximum size of the coarse aggregate.
COVER TO MAIN REINFORCEMENT :-
Column : 40 mm (D>12mm)
Column : 25 mm (D= 12mm)
Beam : 25 mm
Slab : 15 mm (or) not less than dia of the bar.
Footing : 50 mm
Sunshade (Chajja) : 25 mm
STEEL :-
Weight of rod per meter length = d2/ 162 where d in mm
“L” for column main rod in footing is minimum of 300mm
Hook for stirrups is 9D for one side
For Cantilever anchorage length for main steel is 69D
No. of stirrups = (clear span/Spanning) + 1
Design strength is M 40, target strength is 1.25 x 40 = 50 Mpa
THEROTICAL WEIGHT:-
Cement = 1440 Kg/m3
Steel = 7850 Kg/m3
Bricks = 1600 – 1920 Kg/m3
1 HP = 745.7 watts
WEIGHT OF ROD PER METER LENGTH:-
DIA WEIGHT PER METER
6mm = 0.222
8mm = 0.395
10mm = 0.616
12mm = 0.888
16mm = 1.578
20mm = 2.466
25mm = 3.853
32mm = 6.313
40mm = 9.865
CMENT REQUIREMENTS :-
M10 : 210 Kg
M20 : 320 Kg
M25 : 340 Kg
M30 : 380 Kg
M35 : 410 Kg
M40 : 430 Kg
M45 : 450 Kg
M50 : 450 + M.S 7.5%